I-25 Paseo del Norte Interchange Study header
decorative color block
Home
Project Overview
Project Alternatives
current status next steps
project documents
frequently asked questions
contact us
blue spacer image
traffic congestion photo
background
EXISTING CONDITIONS
AERIAL MAP

existing conditions aerial map
decorative graphic Click to download project map (pdf)
I-25/PASEO DEL NORTE
STUDY MAP

I25 Paseo study area map
decorative graphic Click to download project map (2 mb pdf)
ACRONYMNS
Click here for acronyms used in project reports. 
spacer
PROPOSED ALTERNATIVES

The “No-Action” alternative and two “Build” alternatives are currently being considered in the I-25/Paseo del Norte Interchange Study.  Illustrations and descriptions of the two Build alternatives can be found by clicking on the photos below.

NO-ACTION ALTERNATIVE
The No-Action Alternative assumes the interchange and adjoining segments of I-25 and Paseo del Norte are maintained in their existing configuration.  No major changes to the interchange or adjoining roadways are made.  Improvements are limited to maintenance projects for pavement, bridge structures, drainage structures, pavement markings, traffic signals, and other basic roadway elements. 

ALTERNATIVE 7

alternative 7 link to alternative 7

ALTERNATIVE 16

Alternative 16 link Link to alternative 16

Other Links:

  • Play video of traffic micro-simulation of Alternative 7
    Requires Flash (download Flash player here)



    Video of traffic micro-simulation of Alternative 7

 

 
 
spacer graphic
 
existing conditions aerial map download